Jump to content
Allegro

Time Measurement Between A...b Point

Recommended Posts

Hi,

 

I want Time measurement between A...B point at a TASK.

 

Clipboard01.jpg

 

I think,

 

i must write at A point;

timer_last = SysGetTime()

 

i must write at B point;

timer_diff = SysGetElapsedTime(timer_last);

 

I am Right Think ??? :rolleyes:

Edited by Allegro

Share this post


Link to post
Share on other sites

Your content will need to be approved by a moderator

Guest
You are commenting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoticons maximum are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

×